Welcome to information about Pennsbury school district.

Pages
  • Home
  • TO DO
  • JUNE 17 Neighbor Meeting
  • Robert M Abrams
  • PSD411.net
  • Act 34 & New Highschool
  • New Highschool plan
  • Synthetic Field
  • Stadium Project x2
  • School Supplies Event
  • Lower Makefield
  • Falls Township
  • Ummm Uhh Board
  • More
    • Home
    • TO DO
    • JUNE 17 Neighbor Meeting
    • Robert M Abrams
    • PSD411.net
    • Act 34 & New Highschool
    • New Highschool plan
    • Synthetic Field
    • Stadium Project x2
    • School Supplies Event
    • Lower Makefield
    • Falls Township
    • Ummm Uhh Board
Pages
  • Home
  • TO DO
  • JUNE 17 Neighbor Meeting
  • Robert M Abrams
  • PSD411.net
  • Act 34 & New Highschool
  • New Highschool plan
  • Synthetic Field
  • Stadium Project x2
  • School Supplies Event
  • Lower Makefield
  • Falls Township
  • Ummm Uhh Board

New High School pICs

A site plan showing a new school layout with sports fields and surrounding residential area.

the new proposed high school

the new proposed high school

the new proposed high school

The yellow highlighted portion is the new school that has been proposed. The white buildings are the current West, East, and elementary schools that will remain until at least 2030 to be demolished. 

Notable mention is West is the same 99 sq yards long as the new HS that will be built in a smaller acreage than West. And in case you were wo

The yellow highlighted portion is the new school that has been proposed. The white buildings are the current West, East, and elementary schools that will remain until at least 2030 to be demolished. 

Notable mention is West is the same 99 sq yards long as the new HS that will be built in a smaller acreage than West. And in case you were wondering, No! none of the $46mil in cosmetics and maintenance completed in 2006 will be paid for before PSD plans to demolish it in 2030. 

East was over hauled in 2005 and the roof was covered with a temporary lining in 2025.

Architectural plan showing a building layout with existing and new pools.

new pool

the new proposed high school

the new proposed high school

We need an 8 lane competition pool because the current old 6 lane pool needs to be replaced.

Spacious modern school lobby with seating and large windows.

Inside the front door

the new proposed high school

Inside the front door

  One primary hall way leading to the Pennsbury Path for over 2900 students and teachers.


Plans

Front Door

Learning Stairs

Learning Stairs

Learning Stairs with no rails shown

Learning Stairs

Learning Stairs

Learning Stairs

no rails shown

Prom route

Learning Stairs

Prom route

Because this is what matters.


Please see ACT 34 HEARING TAB

Copyright © 2026 PSD411 - All Rights Reserved.

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

Accept